The Huron River Greenway was to be a crushed limestone trail running from Huron to Milan (about 8 miles) with a modest interruption in the middle. The trail is built over a section of the old Wheeling and Lake Erie Railway corridor. I was pumped for some gravel riding, and the challenge of finding the northern trail head had raised my anticipation even more. Disappointing to find that you can only ride about a mile before the trail is closed. Should have checked TrailLink which is accurate for this trail.
Northern trail head off River Rd (look for the water tower).
Couple of pics from the short ride.
End of the trail – BUST
I had a 2nd ride planned anyway, the North Coast Inland Trail, so off to Elyria.
Keep on BikeOhio1000!